Why temperature & humidity controllers matter for corrosion and flashover prevention, and how to size heater/fan control.

1. Why condensation forms

An outdoor cubicle breathes. During the day the internal air warms and expands; at night the steel cools faster than the air inside, and the moisture in that air condenses on the coldest surface — usually the busbar insulation, the terminal blocks or the underside of the roof sheet. Dew point is reached long before anyone sees water, and the damage is cumulative: corrosion on contacts, tracking marks on insulators, and eventually a flashover on a humid morning.

2. Control strategy: heater or fan

A temperature and humidity controller solves the problem by keeping the internal air above dew point, or by removing the moisture. Two actuators are used, and the choice depends on the climate:

  • Anti-condensation heater — the standard answer. Energised when relative humidity exceeds the setting, it raises the internal air temperature a few degrees above dew point.
  • Fan or ventilator — used where heat, not moisture, is the main issue, or in hot climates to limit the temperature rise inside the enclosure.
  • Many cubicles use both: a heater on humidity control, a fan on temperature control, with interlocking so they never fight each other.

3. Sizing the heater

A common field error is an undersized heater. As a starting point for a well-sealed cubicle, allow roughly 10–20 W per square metre of exposed cooling surface for light-duty prevention, and substantially more for a poorly sealed or frequently opened enclosure. Cabinet volume alone is a poor guide — surface area and the degree of sealing drive the calculation. Where in doubt, fit the larger heater and let the controller duty-cycle it; a heater that is too small simply never wins.

4. Sensor placement and commissioning

Place the humidity sensor in the upper third of the cubicle, away from the heater itself and away from the direct airflow of a fan — a sensor next to the heater reads dry air and never calls for heat. During commissioning, verify the switching with a simple test: hold a damp cloth near the sensor and confirm the heater contact closes, then confirm the alarm contact reaches the supervision system if one is fitted.

Our application team can size heater and fan control from your cubicle dimensions, IP rating and site climate. Send the enclosure data sheet and we will return a recommendation.